Section E: Signage
General
A compatible standard for all temporary construction signs will avoid visual clutter, improve public understanding of each project, and facilitate cost effective project sign production. The types and styles of signage will be in accordance with the Guide for Construction Site Signage. The number and type of signs required will be determined by the project's scope, visibility, and impact to the NIH campus. The construction contractor shall submit a signage plan to the project officer for approval. The construction area shall be well marked with signs that both notify and protect the general public. No portion of the signage shall extend into the walkway. Sign posts for 'project signs' shall be fabricated from 4"x4" pressure treated wood posts. Sign posts for other types of signs shall be of metal or other suitable material. Related Documents
NIH Master Plan
For more information on Traffic Control Signs, reference “The Manual on Uniform Traffic Control Devices”, U.S. Department of Transportation: http://mutcd.fhwa.dot.gov/ser-shs_millennium.htm
Traffic Control Signs and Markers
Traffic control signs and markings shall follow the minimum requirements set forth by the
Type B - on warning signs
Type C - on barricades or drums in a series for delineation Existing traffic control signs made void during construction shall be removed, stored, and reinstalled by the contractor. Project Signs
Projects with exterior construction sites must have at least one and no more than three site signs (four feet by eight feet) as described in the Guide for Construction Site Signage. Directional signs are permitted to direct traffic to the construction site(s). These signs will be in accordance with the Guide for Construction Site Signage , and will utilize existing posts (for directional signs) to the maximum extent possible. The bottom of directional signs should be at least 6.5 feet (1981 mm) above the ground. Project signs shall be placed on site at least 14 calendar days prior to start of construction. Exterior construction signage shall be removed from the site no more than five workdays after completion of the project. The post holes should be filled in and the ground restored to its original condition. Staging Area and Construction Sites
Contractor's staging areas and construction sites must be well marked to assist visitors and deliveries. Each staging area and each vehicle entrance to a construction site shall be allowed one company sign (no larger than 18 square feet). Individual trailers can have one company sign no larger than three square feet. The sign(s) shall be mounted on the fencing, or inside the staging area or construction site. Download the Adobe Acrobat Reader plug-in.